AetrisCore designs, builds, and operates purpose-built AI data centre infrastructure across EMEA, backed by a senior technical team with actual data centre deployment experience and 7 years of operational excellence in high-density compute.
AI has become the fastest-growing compute workload in the history of technology. Training large language models requires significant energy, often consuming more energy than thousands of households use in a year. Global demand for GPU compute infrastructure is growing faster than traditional data centre construction can meet, constrained by land availability, grid connection timelines, cooling limitations, and CAPEX requirements that take years to deploy. The bottleneck is no longer the AI model. It is the infrastructure. AetrisCore was built to close this gap through a modular approach that reduces deployment timelines from years to weeks, an energy strategy focused on low-cost power access in constrained markets that traditional operators cannot access, and a technical team with direct experience building and operating infrastructure at scale.

Hydro direct to chip cooling
EMEA locations with renewable energy
Modular design
Our primary differentiator. AetrisCore's senior technical team has actual, hands-on experience in data centre infrastructure, including design, commissioning, and operating large-scale compute environments.
Our management team has operated 31.7 MW of BTC mining compute infrastructure across Western Europe and the Middle East since 2018. We understand uptime, thermal management, remote site operations, and energy cost control from years of live operations.
Modular-based infrastructure developed with specialist engineering partners. Each module is purpose-designed for the target geography, climate, and compute workload. Scalable from 12.5MW to 100+ MW without massive upfront commitment or construction timelines.
Over seven years of experience deploying air-cooled and hydro-cooled compute infrastructure, with direct-to-chip hydro cooling currently in active development and deployment for high-density AI GPU workloads. The result: higher GPU utilization, lower PUE, and increased compute density per square metre.
We operate in low-cost, stable, and regulation-aligned, clean energy markets: Scandinavia, Iceland, and the Middle East. Where grid energy is unavailable, we generate our own through on-site gas-to-power systems. Energy is the highest operating cost in AI compute; our advantage here is structural.
Heat recovery, renewable energy, and gas flaring elimination are built into our infrastructure design from day one, not retrofitted for compliance. We align with World Bank ZRF 2030 targets and corporate ESG mandates.
From site selection and energy strategy through construction, deployment, commissioning, and ongoing operations and management, AetrisCore delivers the complete infrastructure stack: one partner, full accountability.

Real-world experience deploying GPU compute infrastructure at scale

Design and operation of liquid cooling for high-density AI workloads

Modular data center infrastructure in extreme environments (arctic and desert)

Gas-to-power systems and grid-independent data centre energy delivery
Modern AI training GPUs generate heat density that standard air cooling cannot manage efficiently. AetrisCore deploys hydro-direct-to-chip cooling as the standard for its AI data centre modules, circulating coolant directly to the processing element, eliminating the thermal bottleneck that limits performance and increases energy waste. The result? Higher GPU utilization, lower PUE, reduced cooling energy, and greater compute density.
Each AetrisCore AI data centre is purpose-engineered and designed by specialist partners for the specific geography, climate, and compute workload of each deployment. For the Middle East: engineered for extreme temperature and high humidity with advanced air management systems. For Nordic environments: optimized for cold ambient temperatures and hydroelectric power integration.
Advanced firmware and remote management systems enable full operational control of deployed infrastructure regardless of location. AetrisCore’s operations team can monitor and manage all deployed sites from a single control environment, allowing rapid response to infrastructure events across large-scale deployments.
Site selection, energy strategy, cooling solution design, and project planning
Design, engineering,installation, and commissioning
Monitoring, energy optimization, hardware lifecycle, and ongoing site management
Gas-to-power systems for grid-independent or grid-supplementary energy
Managed hosting within AetrisCore-operated facilities for clients deploying their own GPU hardware
AetrisCore’s foundation is AVG Trading Company, a company that has operated in the infrastructure business since 2018 in Western Europe, survived the most difficult operating conditions, and built 31.7 MW of live infrastructure across four countries. The team that built AVG is the team building AetrisCore and we have brought in senior AI data centre professionals who have designed, commissioned, and managed large-scale GPU compute environments. This is what operational credibility looks like.
Whether you are an investor, an AI infrastructure partner, or an energy operator, AetrisCore wants to hear from you.